Project
The MBBR was an airport first, supporting Heathrow’s sustainability strategy by upgrading their pollution controls system on the eastern balancing reservoir. £24m capital works included assembly and installation of 1600 stainless steel aeration diffuser heads inside two 15m diameter glass fused steel MBBR aeration tanks. Installation of all PVC and stainless-steel pipework between aeration heads and blowers. Fabrication and installation od new steel support work and leak and pattern testing on the installed grids of each tank. The project was also responsible for training, testing and commission the upgraded system.
Requirements
- CDM inspections
- H&S management
- Commissioning Lead
- Project Engineering assurance
- Site inspections and witness testing
- Technical Advisory